Turnkey warehouse services
From layout design and engineering to installation and relocation — WesRacks is your single-source partner for warehouse storage.
Warehouse Design
Layout & system design backed by PE-stamped engineering. We model your space, load, and throughput to spec a rack system that maximizes density without sacrificing access.
- CAD layout & 3D modeling
- Load capacity analysis
- PE-stamped drawings
- Code compliance (RMI/ANSI)
Professional Installation
OSHA-trained, in-house crews install and anchor every system to spec. We handle permits, anchoring, leveling, and final inspection so you go live on schedule.
- Certified installers
- Concrete anchoring
- Plumb & square to tolerance
- Safety inspection
Relocation & Dismantling
Moving or reconfiguring? We disassemble, transport, and re-erect your existing rack inventory — preserving components, minimizing downtime, and re-anchoring at the new site.
- Disassembly & relocation
- Component inspection
- Re-anchoring
- Downtime-minimized
Used Equipment
Save up to 50% on inspected, certified used pallet rack, cantilever, and shelving. Every component is load-rated and backed by our condition guarantee — new-equivalent performance at used pricing.
- Up to 50% savings
- Inspected & load-rated
- Condition guarantee
- Immediate availability
Not sure what you need?
Chat live with a WesRacks specialist. Tell us your space, load, and timeline — we'll recommend the right system and prepare a free quote.
Start a chatHow long does installation take?
Most pallet rack installs complete in 1–3 days depending on system size; mezzanines typically take 3–7 days. We schedule around your operations to minimize downtime.
Do you provide engineering drawings?
Yes. Every system ships with PE-stamped drawings, load ratings, and anchoring specs for permit and code compliance (RMI/ANSI).
Can you buy my used rack?
Absolutely. We purchase and re-certify used pallet rack, cantilever, and shelving — or trade it toward a new system.
